Scrum for Team System Guidance / Version 3 / Bug History Chart

Report: Bug History Chart

Description:

This report details the Bug work item status history within the specfied data range.

Parameters:

ParameterDescriptionDefault
Area: The feature scope results filter. This value defaults to the root area path for the project.
System State: The status filter of the bug work items. The default value for the parameter is "Active".
Date From: The start date of the reporting range. The active release start date.
Date To: The end date of the reporting range. The active release end date.
Weekends: Choose to include or exclude weekends from the chart display. Exclude.
Build Bugs: Choose to include or exclude bugs generated from build failures. Exclude.

Screen Shot:

Bug history chart. 

Back to Version 3 (TFS 2010)