Scrum for Team System Guidance / Version 3 / Acceptance Test
Work Item: Acceptance Test
Description:
Introduced in the version 3 template, the acceptance test work item is both a contract of acceptance, Product Backlog Item to Bug linkage and Microsoft Test Manager integration work item.
Previous scrum templates included a field in the PBI entitled "Conditions of Acceptance". This work item provides the same concept but as a first class citizen of the template.
Acceptance Tests must be linked to PBIs with the "Microsoft.VSTS.Common.TestedBy" linkage type.
Acceptance Tests must be linked to Bugs with the "Scrum.FailedBy" linkage type.
| Field Name | Description | Data Type |
|---|---|---|
| Title | Name or short description. | Text |
| Description | The detailed description of the acceptance test. | Text |
| State | This is the status of the Acceptance Test Item as selected by the Product Owner or QA | Drop Down List |
| Area | The AreaPath can be used to categorise or theme the Acceptance Test | Project Path |
| Iteration | The iterationPath of the acceptance test. | Project Path |
Screen Shot: